Summary

By relying on Anixter’s technical expertise when it came to the cabling design and product procurement, the integrator was able to provide the end-user with an investment that will meet capacity for the next several years. The legacy system would have run into capacity issues within two or three years. Anixter helped to have the end-user eventual costs while also adding more sustainability into the data center’s design.

Customer

Network integrator

Challenge

Construct two Tier 3 data centers for European bank

Solution

Data Center College, READY!℠ Deployment Services

Results
  • Installed future-proof infrastructure that will perform longer than original solution

  • Minimized waste on site while freeing up installation space