Summary

Anixter worked with us to get the material we needed from its warehouse to the site at the right time in the correct quantities and configurations. That helped minimize our concerns about on-site security for the material and it gave us greater functionality in the field.

Customer

Power utility

Challenge

Fast-track construction of two peaker plants

Solution

READY! To Install, eAnixter

Results
  • Properly cut, tagged and spooled cable delivered on time

  • Minimal remainder inventory

  • Specific reel ordering to minimize product touches

  • Real-time order modifications through integrated ordering platform

  • On-time completion of project within budget