Summary

To meet a short deployment period, Anixter provided an optimized supply chain, that helped the project meet its target date. Technical expertise helped to drive cable specification, which eventually saved the mine operator significant costs.

Customer

Mine Operator

Challenge

Fast-track construction of open-pit mine

Solution

Cable specifications
READY!SM Cabinet

Results
  • Properly specified copper and fiber cables early in the project cycle

  • Conducted quality checks and positioned cable on site, ready to be installed

  • Saved over $300,000