Download the full Case Study
Summary

In response to a major electrical contractor, working to restore power to areas of New York after severe flooding, Anixter utilized its nationwide warehouse network to prepare and package the right products for a quick and easy installation, delivering READY!SM To Install cable within 24 hours.

Customer

Utility Company

Challenge

Electrical and electronic cabling to restore massive power outage

Solution

READY!SM To Install

Results
  • Six truckloads of electrical cabling prepped for installation and delivered on-site in less than 24 hours