Summary

Anixter created a solution that met the contractor’s need for a fast deployment with minimal waste. Instead of delivering to the job site individually, Anixter consolidated the materials in a local distribution facility, removed the original packaging, preassembled the materials and then shipped them to the job site under one part number.

Customer

Large Australian financial institution

Challenge

Consolidating environmentally sustainable multi-tenant building site

Solution

Product enhancement and packaging, sourcing

Results

  • Saved on-site costs by removing original packaging to be sent to recycling center

  • Helped bank achieve environmental objectives

  • Reduced ordering and delivery times for customer with single part-number consolidation